Resource-Loaded Project Schedules

Aurum integrates manpower, equipment, and material planning directly into the project schedule to ensure accurate forecasting, efficient sequencing, and on-time concrete execution.

Manpower Planning

Assigns crews for formwork, reinforcement, placement, finishing, and curing while tracking peak labor demands for major pours.

Sequencing & Logic

Builds realistic durations and dependencies for formwork cycles, reinforcement/post-tension installation, and pour sequencing based on field productivity.

Equipment Coordination

Links activities to required equipment such as cranes, concrete pumps, vibrators, and finishing tools to ensure availability during critical operations.

Weekly Updates

Adjusts manpower, equipment, and material allocations as design changes, weather, or site conditions impact production.

Material Management

Tracks delivery and staging of rebar post-tension, formwork systems, embeds and other key integrated materials to prevent supply delays.

Site Logistics Integration

Aligns resources with access routes, staging areas, and pump locations to maintain safe and efficient jobsite operations.